Project information

Investor / Project owner
TMVI Production Co., Ltd.
General contractor
Song Ngọc
Song Ngọc's role
Main Contractor — Turnkey contractor — Song Ngoc
Project groups
Factories & Industry
Location
Lot CN-1.1, Viet Han IP, Viet Yen Ward, Bac Ninh, Bắc Ninh
Work package / Item
From site leveling to finishing and equipment installation
Scale
25,056 m² land · 14,936.83 m² built-up
Timeline
2026
Project code
DA-26-011

Project overview

Two-story main production building (18,301.94 m² floor area), canteen with 4,768.5 m² motorbike parking, pump station and underground water tank, 2,500 kVA substation, wastewater treatment plant, guardhouse, gate, fence, internal roads, landscaping and fire protection.

TMVI Garment Factory

  • Investor: TMVI Manufacturing Co., Ltd.
  • Construction contractor: Song Ngọc Mechanical Construction Co., Ltd.
  • Location: Lot CN-1.1, Viet Han Industrial Park, Việt Yên Ward, Bắc Ninh Province

The project has a total land area of 25,056 m², of which the construction area reaches 14,936.83 m². The main work packages include:

  • Two-story main production building (floor area 18,301.94 m²)
  • Canteen combined with motorcycle parking area (4,768.50 m²)
  • Pumping station and underground water tank
  • 2,500 kVA transformer station with generator room
  • Wastewater treatment plant system
  • Guard house, customer canteen, car parking
  • Main gate, fence, flagpole, signage
  • Internal traffic system, landscaping and fire protection equipment
    The entire project was constructed under Contract No. 03/2026/XD-TMVI-SN, including from site filling to completion and equipment installation.